Open MorePadel club in Neuötting with indoor courts in use

Jungle Padel Neuötting

The courts are open and the club is operating. Explore current photos and the first actual results from Neuötting. Funding is complete and no further investment is available.

Original photograph · Neuötting in operation · October 2026
01 / Club concept

An existing hall has become a thriving padel club

The project addresses a market outside the major cities and focuses on recurring players, local partnerships and reliable indoor operations.

The club is open. Court utilisation reached 45% in its first month. Delivery came in €20,000 under budget, while opening was delayed by 40 days against the original plan. The reference case reports both the start of operations and deviations from the plan transparently.

  • Open & operating
  • Regional roots
  • Community-first
  • Funding complete
Actual results at launch

Neuötting is in play

As of 03.11.2026
Utilisation · month one45%

Court utilisation in the first month of operations

Under budget€20,000

Project costs below the planned budget

Delay+40 days

Opening later than originally planned

Actual launch figures reported by MorePadel. The financial models below show the original planning scenarios, not achieved operating results.

03 / Public project metrics

Asset, catchment and accessibility at a glance

Location and building data from the current project model. The released financial data is available openly below; contractual documents remain access-restricted.

01 · Club formatIndoor
02 · Courts5 indoor
03 · Hall area1,390 m²
04 · 30-min catchment238,000
As of: 25.07.2026 · Internal location model · data as of 25.07.2026
04 / Location thesis

Why this club can work in this location

5 MIN.8,500people in catchment
10 MIN.37,000people in catchment
15 MIN.86,000people in catchment
20 MIN.151,000people in catchment
30 MIN.238,000people in catchment

Jungle Padel Neuötting is open and operating. Court utilisation reached 45% in the first month; delivery came in €20,000 under budget, with a 40-day delay.

  • Open & operating
  • Regional roots
  • Community-first
  • Funding complete
05 / Public target model

The original planning model for comparison

The historical planning scenarios show revenue, EBITDA, ROI, IRR, break-even and potential distributions. They are separate from the reported actual launch figures.

No unlock required

Original planning model for Neuötting

This internal model was exported on 29.07.2026 and remains available as the original plan. Base, downside and upside cases are target calculations, not actual results or a return commitment. Reported launch figures are shown separately above.

Funded total investment€429,302€351,960 base CAPEX · 20% buffer + deposit
Target revenue p.a.€488,280Base case · stabilised operations from year 2
Target EBITDA€262,966Base case · before tax and maintenance CAPEX
Target EBITDA margin53.9 %Base case · 35% court utilisation
Stabilised cash yield61.3 %EBITDA relative to invested equity
Project IRR45.3 %Internal ten-year model · base case
Equity multiple · 5 years2.61×Cumulative model cash-flow ratio
Model paybackMonth 29Base case · upside case month 21
MP project score84 / 100Internal project assessment · as of 29.07.2026
ScenarioUtilisationRevenue p.a.EBITDAMarginCash YieldIRRPayback
Downside25 %€352,200€131,85337.4 %30.7 %20.5 %Month 52
Base case35 %€488,280€262,96653.9 %61.3 %45.3 %Month 29
Upside45 %€624,360€394,07963.1 %91.8 %67.0 %Month 21

Core assumptions

  • 5 indoor courts across 1,390 m² with 8 m clear height
  • €42 per court hour · 18 opening hours daily · 30 operating days monthly
  • 12-month ramp-up to 35% average court utilisation in the base case
  • 100% equity · no bank debt · 5-year lease + 5-year extension option
  • €4,469 monthly site costs · €17,291 additional fixed OPEX
Transparent model limits

The supplied export assumes 0% tax and maintenance CAPEX; electricity/heating and software currently carry no additional amount. These items may materially reduce EBITDA, cash yield, IRR and payback and must be confirmed in the final model before any investment decision.

Source: internal Neuötting project model · exported 29.07.2026 · not actual data
06 / Project status

From location review to opening

  1. 01

    Screening

    Complete

  2. 02

    Location review

    Complete

  3. 03

    Lease agreement

    Complete

  4. 04

    Project approval

    Complete

  5. 05

    Funding window

    Complete

  6. 06

    Club open

    Complete

07 / Documents & risks

Everything relevant in one calm place

01

Investor presentation

After enquiry

Project-specific structure
02

Location analysis

After qualification

Project-specific
03

Financial model

Protected data room

Financial data protected
04

Contractual documents

Protected data room

Project-specific structure
Risks & assumptionsView project risks
R1

Entrepreneurial risk

Performance may fall short, including the possible complete loss of invested capital.

R2

Illiquidity

Interests may be difficult or impossible to sell. Exit at any time is not assured.

R3

Project and permitting risk

Construction, financing, contracts and permits may be delayed, become more expensive or fail.

R4

Utilisation and competition risk

Demand, pricing, costs and competition may differ from assumptions. Distributions are not guaranteed.

08 / Next investment opportunity

Neuötting is fully funded – register for the next round

Neuötting is not accepting further investors. Share your preferences for open and upcoming club projects.

Non-binding enquiry

What are you interested in?

Interest
Your personal details are not sent to analytics systems.
Review open project