MorePadel
MorePadel Performance Center — club visualisation

CONCEPT / PERFORMANCE / 01 · Southern German metro region

MorePadel Performance Center

The MorePadel Performance Center combines padel, coaching, athletic development and analysis in a large-scale indoor product for ambitious players and corporate clients.

Investment Concept 01

The club built for measurable progress.

The reviewed project corridor is in an economically strong southern German metropolitan region: 1.20 million people within 30 minutes, around 590,000 employees, a university environment of 88,000 people and a purchasing-power index of 106 provide a broad demand base. The exact city and micro-location are disclosed only through protected investor access.

This is not an interchangeable court venue. Coaching pathways, video analysis, athletic training, leagues and corporate products make improvement visible and are designed to turn occasional players into retained performance members.

  • Performance & coaching
  • Athletic training + video analysis
  • Corporate and after-work focus
  • Southern German metro region

Concept moodboard

This is how the Performance Center should feel.

The visual world translates positioning, materials and use into one coherent experience. It is an illustrative design direction, not final architecture or construction planning.

Moodboard for the MorePadel Performance Center concept
Illustrative design direction · not final planning
01

Coaching engine

Structured levels, academy formats, match analysis and clear development pathways.

02

Performance lab

Athletic training, diagnostics and recovery as credible extensions of the court product.

03

League & corporate

Leagues, team formats and after-work packages increase frequency and retention.

04

Data-led retention

Progress, utilisation and community activity become systematically visible in operations.

01 / Public project metrics

Concept and anonymised market profile at a glance.

The public view shows the concept and general catchment. Exact city, micro-location, building, financial and contractual data follow separately after investor access.

01 · Club conceptPerformance Center
02 · Market typeSouthern German metro region
03 · Population · 15 min485,000
04 · Population · 30 min1.20m
As of: 25.07.2026 · Internal market and concept model · data as of 25.07.2026
02 / Concept and market thesis

Why this concept can work in this market.

5 MIN.45,000people in catchment
10 MIN.190,000people in catchment
15 MIN.485,000people in catchment
20 MIN.735,000people in catchment
30 MIN.1.20mpeople in catchment

The MorePadel Performance Center combines padel, coaching, athletic development and analysis in a large-scale indoor product for ambitious players and corporate clients.

  • Performance & coaching
  • Athletic training + video analysis
  • Corporate and after-work focus
  • Southern German metro region
03 / Protected financial model

Sensitive financial data only after investor access.

This separation prevents model-based return, cost and contract information from appearing as freely accessible promotional claims.

Preview · Investor data roomProtected financial data

Plus scenario model, sensitivity analysis and financing structure

CapitalTotal investmentProtected
CapitalFit-out & CAPEXProtected
CostsAnnual rentProtected
CostsRamp-up liquidityProtected
OperationsTarget revenue p.a.Protected
OperationsCourt utilizationProtected
ResultTarget EBITDAProtected
ResultEBITDA marginProtected
ReturnClub paybackProtected
ReturnTarget distributionProtected
ReturnProject IRRProtected
RiskDownside bufferProtected
03Financial scenarios06Sensitivities01Complete model calculation

Protected financial data

View financial data.

View the financial model, scenarios and return assumptions after a short request.

Non-binding · not investment advice.
Add phone number (optional)
Secure transmission · not shared with analytics systems
04 / Project status

From location review to opening.

  1. 01

    Location review

    Complete

  2. 02

    Structuring

    Current

  3. 03

    Financing

    Current

  4. 04

    Build & installation

    Conditional / planned

  5. 05

    Opening & ramp-up

    Conditional / planned

05 / Documents & risks

Everything relevant in one calm place.

01

Investor presentation

After enquiry

Project-specific structure
02

Location analysis

After qualification

Project-specific
03

Financial model

Protected data room

Financial data protected
04

Contractual documents

Protected data room

Project-specific structure
Risks & assumptionsView project risks
R1

Entrepreneurial risk

Performance may fall short, including the possible complete loss of invested capital.

R2

Illiquidity

Interests may be difficult or impossible to sell. Exit at any time is not assured.

R3

Project and permitting risk

Construction, financing, contracts and permits may be delayed, become more expensive or fail.

R4

Utilisation and competition risk

Demand, pricing, costs and competition may differ from assumptions. Distributions are not guaranteed.

06 / One access point

Financial data and investor pack in one step.

The form in the protected financial model is the only access point on this project page. Choose there whether you want financial data only or the full investor pack as well.

No second form and no duplicate data entry: your project choice is already set.

Go to investor access View the process
Non-binding enquiry · response usually within 2–3 business days
Request investor pack